Dual-resource Constrained Scheduling for Quality Control Laboratories
| dc.contributor.author | Cunha, M. | |
| dc.contributor.author | Viegas, J. | |
| dc.contributor.author | Martins, M. | |
| dc.contributor.author | Coito, T. | |
| dc.contributor.author | Figueiredo, Joao | |
| dc.contributor.author | Sousa, J. | |
| dc.contributor.author | Vieira, S. | |
| dc.contributor.editor | ELSEVIER | |
| dc.date.accessioned | 2020-02-28T12:05:55Z | |
| dc.date.available | 2020-02-28T12:05:55Z | |
| dc.date.issued | 2019 | |
| dc.description.abstract | This work presents a novel formulation for quality control laboratory scheduling considering both equipment and analysts as constraints. The problem is modelled as a dualresource constrained exible job shop problem. The formulation considers analyst's tasks in multiple time points during the processing of samples. The mathematical model is implemented as a mixed integer linear programming model (MILP) aiming to minimize makespan. Two sets of instances for the scheduling problem are developed and solved. The rst instance consists on a small example that illustrates the proposed formulation and is solved to optimality. The second instance mimics the real industrial problem and shows the challenges resulting from growing complexity. | por |
| dc.identifier.authoremail | nd | |
| dc.identifier.authoremail | nd | |
| dc.identifier.authoremail | nd | |
| dc.identifier.authoremail | nd | |
| dc.identifier.authoremail | jfig@uevora.pt | |
| dc.identifier.authoremail | nd | |
| dc.identifier.authoremail | nd | |
| dc.identifier.citation | M. Cunha, J. Viegas, M. Martins, T. Coito, J. Figueiredo, J. Sousa, S. Vieira, [2019] “Dual-resource Constrained Scheduling for Quality Control Laboratories”, Intl. IFAC/IEEE/IFIP/IFORS Conf. on Manufacturing Modelling, Management and Control - 9th MIM 2019, Berlin, Germany | por |
| dc.identifier.doi | https://www.sciencedirect.com/journal/ifac-papersonline/vol/52/issue/13 | por |
| dc.identifier.scientificarea | 493 | por |
| dc.identifier.uri | https://www.sciencedirect.com/journal/ifac-papersonline/vol/52/issue/13 | |
| dc.identifier.uri | http://hdl.handle.net/10174/27481 | |
| dc.language.iso | eng | por |
| dc.peerreviewed | yes | por |
| dc.publisher | 9th IFAC Conf. on Manufacturing Modelling, Management and Control | por |
| dc.rights | openAccess | por |
| dc.subject | Scheduling | por |
| dc.subject | dual-resource constraint | por |
| dc.subject | quality control | por |
| dc.subject | flexible job shop | por |
| dc.subject | mixed integer linear programming | por |
| dc.title | Dual-resource Constrained Scheduling for Quality Control Laboratories | por |
| dc.type | article | por |