Dual-resource Constrained Scheduling for Quality Control Laboratories

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

9th IFAC Conf. on Manufacturing Modelling, Management and Control

Abstract

This work presents a novel formulation for quality control laboratory scheduling considering both equipment and analysts as constraints. The problem is modelled as a dualresource constrained exible job shop problem. The formulation considers analyst's tasks in multiple time points during the processing of samples. The mathematical model is implemented as a mixed integer linear programming model (MILP) aiming to minimize makespan. Two sets of instances for the scheduling problem are developed and solved. The rst instance consists on a small example that illustrates the proposed formulation and is solved to optimality. The second instance mimics the real industrial problem and shows the challenges resulting from growing complexity.

Description

Citation

M. Cunha, J. Viegas, M. Martins, T. Coito, J. Figueiredo, J. Sousa, S. Vieira, [2019] “Dual-resource Constrained Scheduling for Quality Control Laboratories”, Intl. IFAC/IEEE/IFIP/IFORS Conf. on Manufacturing Modelling, Management and Control - 9th MIM 2019, Berlin, Germany

Endorsement

Review

Supplemented By

Referenced By