Dual-resource Constrained Scheduling for Quality Control Laboratories
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
9th IFAC Conf. on Manufacturing Modelling, Management and Control
Abstract
This work presents a novel formulation for quality control laboratory scheduling
considering both equipment and analysts as constraints. The problem is modelled as a dualresource
constrained
exible job shop problem. The formulation considers analyst's tasks in
multiple time points during the processing of samples. The mathematical model is implemented
as a mixed integer linear programming model (MILP) aiming to minimize makespan. Two sets
of instances for the scheduling problem are developed and solved. The rst instance consists on a
small example that illustrates the proposed formulation and is solved to optimality. The second
instance mimics the real industrial problem and shows the challenges resulting from growing
complexity.
Description
Citation
M. Cunha, J. Viegas, M. Martins, T. Coito, J. Figueiredo, J. Sousa, S. Vieira, [2019] “Dual-resource Constrained Scheduling for Quality Control Laboratories”, Intl. IFAC/IEEE/IFIP/IFORS Conf. on Manufacturing Modelling, Management and Control - 9th MIM 2019, Berlin, Germany