CCS Infrastructure Development Scenarios for the Integrated Iberian Peninsula and Morocco Energy System

dc.contributor.authorKanudia, Amit
dc.contributor.authorBerghout, Niels
dc.contributor.authorBoavida, Dulce
dc.contributor.authorvan den Broek, Machteld
dc.contributor.authorCabal, Helena
dc.contributor.authorCarneiro, Júlio
dc.contributor.authorFortes, Patrícia
dc.contributor.authorGargiulo, Maurizio
dc.contributor.authorGouveia, João Pedro
dc.contributor.authorLabriet, Maryse
dc.contributor.authorLechón, Yolanda
dc.contributor.authorMartinez, Roberto
dc.contributor.authorMesquita, Paulo
dc.contributor.authorRimi, Abdelkrim
dc.contributor.authorSeixas, Júlia
dc.contributor.authorTosato, Giancarlo
dc.contributor.editorDixon, Tim
dc.contributor.editorYamaji, Kenji
dc.date.accessioned2014-01-21T11:34:46Z
dc.date.available2014-01-21T11:34:46Z
dc.date.issued2013
dc.description.abstractThis paper briefly illustrates a method to represent national energy systems and the geographical details of CCS infrastructures in the same technical-economic model. In the MARKAL-TIMES modeling framework a model of Morocco, Portugal and Spain with both spatial and temporal details has been implemented. As a function of assumptions on the development to 2050 of mitigation levels, economic growth and CO2 capture-transport storage characteristics, dozens of scenarios were prepared with the TIMES-COMET model. A few results on optimal levels of CCS contribution to mitigation compared to other energy system options are presented. The results also indicate the least cost lay out of the main capture, transport and storage infrastructures. It is concluded that the availability of CCS after 2020 will reduce the cost of mitigation in the Iberian Peninsula as soon as the EU GHG emissions reduction targets become more stringent than decided so far.por
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailjcarneiro@uevora.pt
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.citationKanudia, A., N. Berghout, D. Boavida, M. van den Broek, H. Cabal, J. Carneiro, P. Fortes, M. Gargiulo, J. P. Gouveia, M. Labriet, Y. Lechón, R. Martinez, P. Mesquita, A. Rimi, J. Seixas and G. Tosato (2013). "CCS Infrastructure Development Scenarios for the Integrated Iberian Peninsula and Morocco Energy System." Energy Procedia 37: 2645-2656.por
dc.identifier.doi10.1016/j.egypro.2013.06.149
dc.identifier.scientificarea242por
dc.identifier.urihttp://hdl.handle.net/10174/9827
dc.language.isoengpor
dc.peerreviewedyespor
dc.publisherElsevierpor
dc.rightsrestrictedAccesspor
dc.subjectEnergy scenariospor
dc.subjectclimate change mitigationpor
dc.subjectCO2 emissionspor
dc.subjectcapture transport storage infrastructurespor
dc.subjectMARKALTIMESpor
dc.subjectpartial economic equilibriumpor
dc.subjectbottom-up technological modelspor
dc.subjectGIS transport modelspor
dc.titleCCS Infrastructure Development Scenarios for the Integrated Iberian Peninsula and Morocco Energy Systempor
dc.typearticlepor

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1-s2.0-S1876610213003925-main.pdf
Size:
1.91 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
3.89 KB
Format:
Item-specific license agreed upon to submission
Description: