Sensitivity analysis and pre-feasibility of reprocessing Au from a tailings dam in the Iron Quadrangle - The case of Cocoruto Dam, Nova Lima, Minas Gerais

dc.contributor.authorLemos, M.
dc.contributor.authorValente, T.
dc.contributor.authorMarinho Reis, P.
dc.contributor.authorFonseca, R.
dc.date.accessioned2026-02-05T10:38:51Z
dc.date.available2026-02-05T10:38:51Z
dc.date.issued2024
dc.description.abstractAs historical waste has accumulated in dams, the interest in studying the feasibility of reusing mining tailings has grown, offering both environmental and economic advantages. However, given the unique characteristics of each site, conducting site-specific assessments is crucial. Building on a detailed evaluation of the Cocoruto Dam in Nova Lima, Minas Gerais, this study presents a technical feasibility and financial viability analysis of three potential reprocessing scenarios. The primary objective was to assess the viability and potential benefits of reusing Au tailings. The proposed methods involve grinding, calcination and leaching, with designs adaptable for existing metallurgical plants. Considering the economic potential of Au in these inactive mine tailings (with an average grade of 0.95 mg/kg and a total resource of 3,350.55 tonnes), multiple factors were analyzed to determine the feasibility of Au production from this source. Analyzed variables included: cut-off grades and tonnage for each scenario; net present value (NPV) calculated with an 8% annual discount rate; a general slope angle of 20 degrees; three possible final pit configurations; different annual production rates (400,000 t, 800,000 t and 1,000,000 t), and various Au ounce values ($1300/oz, $1500/oz, and $1700/oz). From a financial perspective, for all ounce values and an annual production of 400 tonnes, all scenarios prove profitable. However, other risks and parameters should be further evaluated.por
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailnd
dc.identifier.authoremailrfonseca@uevora.pt
dc.identifier.citationLEMOS, M.; VALENTE, T.; MARINHO REIS, P.; FONSECA, R. (2024) Sensitivity analysis and pre-feasibility of reprocessing Au from a tailings dam in the Iron Quadrangle - The case of Cocoruto Dam, Nova Lima, Minas Gerais" Mining • REM, Int. Eng. J. 77 (3) • 2024 •por
dc.identifier.doihttps://doi.org/10.1590/0370-44672023770083por
dc.identifier.revistaREM, Int. Eng. J.
dc.identifier.scientificarea396por
dc.identifier.urihttps://doi.org/10.1590/0370-44672023770083
dc.identifier.urihttp://hdl.handle.net/10174/40820
dc.language.isoengpor
dc.peerreviewedyespor
dc.rightsopenAccesspor
dc.subjectcircular economypor
dc.subjectmining tailingspor
dc.subjectAu recoverypor
dc.subjectBenefit Functionpor
dc.subjectfeasibilitypor
dc.titleSensitivity analysis and pre-feasibility of reprocessing Au from a tailings dam in the Iron Quadrangle - The case of Cocoruto Dam, Nova Lima, Minas Geraispor
dc.typearticlepor

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
9-MIN-Sensitivity analysis and-230083.pdf
Size:
1.08 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
3.89 KB
Format:
Item-specific license agreed upon to submission
Description: